Stop Managing 10 Suppliers. Source Your Custom Cabinets in One Plan.
- Design Service Layout • 3D Render • Material Selection • Shop Drawings
- Building Materials Supply: Cabinet • Flooring • Tiles • Doors • Sanitary • Lighting
- Whole-House Customization Kitchen • Wardrobe • Vanity • Door System
- Door-to-Door Support Packing, consolidation, documents, and delivery coordination for your destination.
Custom Cabinets for Every Space in Your Home
Choose a cabinet type below and get a quote in 24 hours.
Custom Kitchen Cabinets












Custom Wardrobe Cabinets







One-Stop Building Materials for Whole-Home Projects
Select a category below — we’ll help you match finishes and build a complete material list.
Custom Cabinets
Bathroom Fixtures
Door & Windows
Lighting Fixtures
Custom Staircases
Tiles
Furniture
Soft Furnishings
Stone
What Usually Goes Wrong When You Import Materials for a Renovation?
Different roles face different risks. Our one-stop system keeps everything on spec, on schedule, and on budget—reducing delays, rework, and costly surprises.
Too many choices, no clear material plan
- You see beautiful designs, but don’t know what materials match together.
- Result: style looks “mixed”, budget keeps expanding.
- You need: a curated material list for the whole house.
Budget and timeline keep slipping
- Quotation changes after you commit, and shipping time is unclear.
- Result: delays + extra labor cost.
- You need: transparent BOM + shipping schedule.
Quality mismatch (photos look great, reality doesn’t)
- Color difference, wrong texture, weak hardware, inconsistent batches.
- Result: re-ordering + frustration.
- You need: samples + QC checkpoints before shipping.
Damaged goods / missing items after delivery
- Poor packaging and no consolidation system cause breakage.
- Result: project stops waiting for replacements.
- You need: export-grade packaging + itemized packing list.
Why Choose Our One-Stop Solution?
While traders sell separate products, George Group engineers complete systems. We eliminate the chaos of multi-vendor coordination.
Unified Aesthetic
Same Color. Zero Mismatch.
- Doors from Factory A don't match Cabinets from Factory B. The lobby looks patched together.
- George Solution:Whole-Home Color System: We guarantee 0% color deviation across all joinery items.
Single-Source
One Contract. Total Control.
- Five suppliers point fingers when sizes don't fit. Project timeline delays by months.
- George Solution:Direct Factory Control: Metal, wood, glass—all under one supply chain. One point of contact.
Sync Delivery
Right Items. Right Time.
- Sofas arrive but wardrobes are missing. Your construction site becomes a storage nightmare.
- George Solution:Phased Set Delivery: We package all items floor-by-floor. Arrives exactly per your schedule.
1000+ Full Project Experience
In the past time, we have successfully completed up to 1,000 procurement projects covering a variety of property types such as hotels, villas, apartments, resorts and offices.
One-stop procurement, we can provide you with all-round support from demand analysis, supplier screening, product selection, contract signing to logistics distribution and after-sales service.
Customers Testimonials
The facts speak for themselves, and our clients are a testament to George’s dedication to service!
FAQs – About Custom Cabinet & Full-House Custom
Transparency is our policy. Everything you need to know about production, logistics, and quality.
How do we start a whole-house customization project?
You can start by sending your floor plan—our process highlights one-on-one discussions to understand requirements and then supply items based on the design direction.
What is the typical lead time?
Lead time varies by product and project complexity.
Built-in closet cabinets: typically 4–6 weeks after final design approval.
Slim broom closet cabinet: typically 2–4 weeks, plus international shipping may add 1–3 weeks for transit and customs clearance.
Sanitary ware page: delivery cycle generally 30–40 days (depending on order size/complexity).
For your project, we’d confirm the timeline during consultation (the service process explicitly mentions discussing budget and timeline).
How do you reduce shipping damage (packaging)?
The service page states your packaging & logistics team creates a custom packaging solution for each order, especially for fragile items, to help ensure safe arrival.
How do you avoid color difference / finish mismatch?
We recommends confirming colors with samples/swatches, testing in real lighting, and locking in colors before procurement/construction to prevent mismatches and delays.
For whole-house projects, We a providing 3D renderings so clients can preview the overall effect in advance.
If I don't visit the factory, how can I trust the quality?
I don't know how to import from China. Can you help?
Are your materials eco-friendly?
What is your response time for after-sales issues?
Do your products meet international hotel standards?
As an overseas buyer, how can I be sure you will deliver on time?
On-time delivery is our lifeline.
1. Our 200+ engineer team completes BOM decomposition 30% faster.
2. You can track real-time production status via our ERP+MES system.
3. We include penalty clauses for delay in the contract to guarantee your timeline.
What is your factory capacity? Can you handle large projects?
We run our own factories, and we also scale through equity-partner factories we invest in and operate under unified standards.
Our custom cabinet facility alone features a 100,000+ m² base with German HOMAG Industry 4.0 automation and 500,000+ units/year capacity—ready for 50 villas or 2,000 apartments, with reliable lead times.
Reach Out to Our Experts
Discover tailored solutions designed to meet your needs. Our team is ready to assist you with building materials, export logistics, and custom projects.
Share Your Project Details – Get a Reply in 24 Hours!
We respect your privacy. Your number is used strictly to discuss your project and share your quote or proposal via WhatsApp. No spam, no cold calls.

